Snow contracts are short documents with a lot riding on a few words. A phrase like "zero tolerance" or "clear by opening" sounds clear in October and turns out to mean three different things at five in the morning in January. The snow industry has a standard vocabulary for this, published by the Snow & Ice Management Association (SIMA), and knowing it makes a proposal much easier to read and compare. This guide walks through the terms you will meet, in roughly the order they appear in a contract, and what to check under each.
Why does the wording in a snow contract matter so much?
Because a contract is the only thing both sides can point to when a morning goes badly. SIMA's procurement standard, SIMA-10-2025, says it was written because current practice produces inconsistent terms, lack of clarity and unmet expectations. Its fix is simple: define the level of service, the scope of work and the site plan in a signed document, and use words that mean the same thing to everyone.
Many disputes trace back to one undefined word. Nobody agreed what "clear" meant on a walkway, or whether a second pass in a long storm was a new visit, or who could call the crew out on a Sunday. Each term below exists to close one of those gaps.
What is the difference between level of service and scope of work?
Level of service (LOS) is the outcome: what the property should look like and when. SIMA defines it as a description of expected outcomes, typically surface conditions at specific completion times, plus what changes when an event runs longer or deeper than a defined amount. Its synonym is service level agreement. Scope of work (SOW) is the activity and the place: which services, on which areas. The SOW can also record issues that will affect the work, such as poor drainage or slopes.
A good contract has both. An LOS without a scope says "walks clear by 7" but not which walks. A scope without an LOS lists every surface but never says when they should be done. SIMA-10 also advises that outcome wording should not go beyond the phrase "substantially clear of hazards", which is a useful check on promises that sound reassuring and cannot be kept in a storm.
What is a trigger depth, and how is it different from an accumulation threshold?
A trigger depth is the agreed, measurable amount of snow or ice at which service is dispatched. An accumulation threshold is the agreed maximum amount allowed to build up on a surface. SIMA's glossary specifically warns not to confuse them. A two-inch trigger means the crew is sent at two inches; a two-inch threshold means the surface should never carry more than two inches, which in a heavy storm requires the crew to be working long before and after that point.
Both are kinds of service initiator, SIMA's general term for whatever contractually starts service. Others include a weather forecast, a written request from the client, an automated work order, or the contractor's judgment on a site inspection or ice patrol. Your contract should list which initiators apply, and SIMA-10 adds that it should say when they change in extended or severe events. Our guide to trigger depth covers how to choose the number.
What does completion time mean?
Completion time is the time or window by which the agreed outcome should be reached. SIMA's examples are "clear by 7 a.m.", "clear between 7 and 8 a.m." and "clear 2 hours after the snow event ends". Those are three very different promises. The first ties the crew to the clock, the second to a window, and the third to the weather.
SIMA-10 lists the times worth writing down: when the public uses the site, employee arrivals and shift changes, delivery times, lighting schedules, and who watches the site and when. Tie completion times to those, and be realistic about snow that is still falling at the deadline. Our guide to realistic snow service response times explains why.
What does "zero tolerance" actually promise?
Less than it sounds like. SIMA's glossary describes zero tolerance as a general term for a low tolerance for snow and ice, and states that the descriptor alone does not designate a level of service. In other words it is a mood, not a specification. If a property needs very low accumulation, the contract should express that through a trigger depth, an accumulation threshold, completion times and ice monitoring, not a slogan.
What are snow clearing, relocation, removal and hauling?
These four words are used loosely in conversation and precisely in contracts. Snow clearing is moving snow off a defined surface; the glossary treats snowplowing and snow pushing as synonyms. Snow relocation is moving it again within the site after clearing, to stack or stage piles. Snow removal is taking snow completely off the site, and hauling is the transport part of that. SIMA notes that removal is not the same as relocation.
The difference matters for billing and planning. A contract that says "snow removal" may be read as including hauling when the owner only expected plowing, or the reverse. On tight lots where piles run out of room by late winter, it is worth naming relocation and hauling as separate services with their own initiator, rather than discovering the question in February. Our parking lot snow plan guide covers storage.
What is the difference between anti-icing, deicing and sanding?
Anti-icing is applying a deicer before a storm to stop ice forming and bonding, or to make plowing easier. Deicing is applying it to snow or ice that is already there, to melt it and weaken its bond. Pre-treating, in SIMA's terms, is something else again: adding a liquid to a solid deicer such as rock salt to improve its performance. Sanding is spreading an abrasive for temporary traction; SIMA notes sand melts nothing and is often used when it is too cold for sodium chloride to work.
Contracts should name which of these are included and which materials are allowed or prohibited on the site. SIMA-10 asks for exactly that, including any restrictions for structural or environmental reasons, and whether material may be stored on site. If a walkway is new concrete or borders planting, say so here. Our ice melt guide covers product choice.
What are ice monitoring and post-storm services?
Ice monitoring, also called ice watch, policing or ice patrol, is a contracted service where someone visits the site to check for ice forming. Post-storm requirements, in SIMA-10, are the services expected after an event is over. In the Missoula and Bitterroot valleys, where afternoon melt refreezes after dark, these are where most of the slip risk sits. A contract that covers the storm but says nothing about the following three nights has left the most common hazard undefined. Our guide to black ice on drives and walks explains the refreeze.
What are the site map and the site engineering plan?
The site map is the owner's map used for bidding: in SIMA-10's terms it should show accurate boundaries, the areas to be serviced, approved stacking areas, high-priority areas and locations for salt bins and equipment staging, ideally with a grid so areas can be referenced. The site engineering plan is the contractor's version, provided before the season, showing service areas, priorities, key obstacles and where snow will be piled.
These two documents are what turn a contract from words into a plan. They are also where staking belongs: SIMA-10 says the contract should define whether the contractor installs and removes snow stakes and when. Our guide to snow stakes and markers explains why that matters.
What do caps, floors and inclusions mean in pricing?
They are modifiers on a pricing model. A cap is an upper limit (inches or visits) after which more charges apply. A floor is a lower limit below which a credit applies. An inclusion is a seasonal price that includes all materials, generally with no cap. How the base models compare is in our guide to seasonal, per-push and hourly contracts.
Which clauses deserve a lawyer or an insurer's eye?
Anything about indemnity, hold-harmless language, insurance requirements and who is responsible for damage. SIMA-10 asks contracts to define who repairs damage not identified in preseason photos or walkthroughs, which is a practical place to start, but the legal effect of an indemnity clause is a question for an attorney, and coverage is a question for your insurer. This guide is general information, not legal advice. Our guides on insurance questions for a snow contractor and slip-and-fall liability in Montana go further.
How do we use these terms on our own accounts?
Our commercial and HOA accounts are agreed before winter and written down surface by surface: the trigger, the order areas are cleared, where snow goes, and how ice is handled. We would rather spend an hour on definitions in October than an argument in January. You can see how that works on our commercial snow and ice management and HOA snow removal pages, and how we respond to storms outside the normal cycle on our snow and 24-hour storm services page.
This guide is part of our Montana Winter Property Guide. Call HJ Property Care & Tree Service at (406) 215-7319 or request a snow proposal and we will walk the site with you before the first storm.
Need help?
HJ Property Care & Tree Service is locally owned and ISA-certified. Call for a free estimate.
This article is part of the Montana Winter Property Guide, our complete guide for western Montana property owners.
Explore our snow & 24-hour storm services.
Sources
We cite primary sources: Montana State University Extension, the City of Missoula, and the ISA, so you can verify anything here yourself.
- SIMA-10-2025 Standard Practice for Procuring and Planning Snow and Ice Management Services (an American National Standard) (Snow & Ice Management Association (SIMA)). Last checked November 2, 2026.
- Snow & Ice Management Standard Glossary of Terms (updated 12/1/2017) (Snow & Ice Management Association (SIMA)). Last checked November 2, 2026.
Ready to transform your outdoor space?
Get a free, no-obligation estimate within 48 hours. Locally owned and ISA-certified.