HJ Property Care & Tree Service
What to expect when a sprinkler system is installed
Irrigation

What to expect when a sprinkler system is installed

Reviewed by Adam Hurlbert, Owner & Founder, 15+ years in landscape & property care

HJ Property Care Team··6 min read·Last updated

A sprinkler installation follows a set order: an assessment of the site and the water supply, a zone design, a utility locate, marking the layout, trenching or pulling pipe, setting the backflow assembly and valves, installing heads and the controller, then flushing, testing and adjusting coverage, and a walk-through. How long it takes depends on the size of the yard, the soil and how many zones it needs, so the schedule comes with your estimate rather than as a general number. Here is what each step involves.

What happens before anyone digs?

The work starts with the property and the water supply. Someone measures the pressure and flow available, walks the yard, and notes sun and shade, slopes, soil, existing trees, beds and lawn. That information drives the design. Your water supply can only push a limited number of heads at once, so the yard is split into zones, and the zones should be drawn by what the plants need and what the ground does, not by what is closest to the valve.

Head type matters as much as zone boundaries. Spray heads put water down much faster than rotors covering the same ground, so the two should not share a zone. Lawn, beds and trees want different watering, and slopes may need shorter cycles with pauses so water soaks in instead of running off. You should see the design before work starts and be able to ask why each zone is where it is.

Why does the utility locate come first for irrigation?

Trenching is excavation. Montana811 asks homeowners to file a free locate request at least three business days before any excavation, and the crew should confirm the marks are in place before the first trench. Public locates may not include private lines such as propane, power to a shop, invisible dog fence or an old irrigation line, so tell the installer about anything you know is buried.

How is the layout marked?

Before trenching, the plan is transferred to the ground, usually with flags for head locations and paint or flags for trench lines, valve boxes and the controller. This is the best moment to walk the yard with the installer. It is easy to move a head or a trench line while it is a flag and much harder once pipe is in the ground. Look for heads that would spray a fence, a window or the driveway, and for trenches that would cross a spot you plan to dig later.

What does trenching do to the lawn?

Pipe goes in narrow trenches or is pulled through the soil, depending on the equipment and the ground. Rocky Bitterroot soil can slow this step, since rock has to come out of the trench line. Expect visible lines across the lawn for a while; the soil is put back and settles, and the crew should tell you how to water and when the lines will fade. Bring up anything you want protected, such as a new patio edge or a tree's root zone, before this step.

Where does the backflow preventer go, and who tests it?

Every system connected to a drinking water supply needs a backflow preventer where the irrigation line leaves the supply, so that water from the lawn can never be pulled back into the house line. In Missoula, the water utility's program requires approved backflow preventers on all underground irrigation systems, maintained and tested annually, and tested immediately after installation by a certified backflow assembly tester, with a test report sent to Missoula Water. Outside the city, ask your water provider. We are not a certified tester, so on our jobs your tester completes that step. Our guide to backflow preventers and annual testing explains the devices.

How are the valves, wiring and controller installed?

Valves for each zone sit in valve boxes, usually grouped where you can reach them. Low-voltage wire runs from each valve to the controller, which is mounted in a garage, a basement or outside. Ask where the valve boxes will be, because you or a future technician will need to find them, and ask for a sketch of where the valves and main lines run. That sketch saves time on every repair for as long as you own the house.

How is the system tested?

Lines are flushed before the heads go on, so debris from installation does not clog nozzles. Then each zone is run and adjusted: arcs set so water lands on the lawn and beds rather than the house, the fence or the sidewalk, heads set level and at the right height, and coverage checked so the spray from one head reaches the next. The U.S. EPA's WaterSense program suggests checking for heads that do not pop up fully or are tilted, and for leaks at the joints between sprinklers and pipe. Those are the things a good final test catches.

What should the walk-through cover?

Before the crew leaves, you should know where the main shutoff, the backflow preventer, the valve boxes and the controller are, how the controller is programmed and how to change it, and what happens in fall and spring. Montana State University Extension's lawn guide says to water early in the morning and as deeply and infrequently as the soil allows, so ask that the schedule is set that way and adjusted for the season. Ask too who does the fall blowout and the spring startup; a system installed in summer still needs both.

How long does an installation take?

It depends on the size of the yard, how many zones the design needs, how rocky the ground is, how much hardscape the pipe has to cross, and the weather. Ask for the expected schedule for your property when you get the estimate, rather than relying on a typical number that may not fit it.

What should you watch for in the first few weeks?

Trenches that settle and need topping up, a soggy spot that does not dry between cycles, which can mean a leaking fitting, and dry arcs at the edge of a zone where a head needs adjusting. Call the installer about any of them early. Our guide to the signs of a leak in an irrigation system lists what to look for.

What should you read next?

If you are still comparing companies, read questions to ask before you hire an irrigation company, and for what moves the price of a new system, see our irrigation system cost guide. For the whole property, start with the Montana Property Care Guide.

When you are ready, see our irrigation installation and repair service, request an irrigation estimate, or call HJ Property Care & Tree Service at (406) 215-7319.

Need help?

HJ Property Care & Tree Service is locally owned and ISA-certified. Call for a free estimate.

This article is part of the Montana Landscaping, Lawn & Irrigation Guide, our complete guide for western Montana property owners.

Explore our irrigation systems.

Sources

We cite primary sources: Montana State University Extension, the City of Missoula, and the ISA, so you can verify anything here yourself.

  1. Homeowner Hub: file a free locate request before you dig (Montana811). Last checked November 11, 2026.
  2. Public Works Standards Manual Appendix 4-A, Cross-Connection/Backflow Protection Program (City of Missoula / Missoula Water). Last checked November 11, 2026.
  3. Sprinkler Spruce-Up (U.S. EPA WaterSense). Last checked November 11, 2026.
  4. Maintaining Successful Lawns in Montana (MontGuide MT202004AG, revised 08/23) (Montana State University Extension). Last checked November 11, 2026.

Ready to transform your outdoor space?

Get a free, no-obligation estimate within 48 hours. Locally owned and ISA-certified.