
Snow and ice management for medical offices and care facilities
Reviewed by Adam Hurlbert, Owner & Founder, 15+ years in landscape & property care
A medical office has the same parking lot as the shop next door and a very different set of people crossing it. Some patients arrive with walkers, canes or fresh injuries, and many visitors are older. Staff at care homes change shifts in the dark, and an ambulance may need the entrance at any hour. A snow plan written for a generic commercial lot leaves those needs to chance. This guide covers how clinics, dental and therapy offices, assisted living and care facilities can write a plan around the people who actually use the site.
Why is snow and ice a bigger issue at a medical site?
Because the consequences of a fall are greater for the people most likely to be there. The CDC reports that more than one out of four older adults falls each year, that falling once doubles the chance of falling again, and that about 37 percent of people who fall report an injury needing medical treatment or limiting activity for at least a day. It also counts nearly 319,000 older adults hospitalized for hip fractures each year. Those figures cover falls of every kind, not only winter ones, but they explain why an icy curb cut at a clinic deserves more attention than the same curb at a warehouse.
Staff face the risk as well. NIOSH, the federal workplace safety research institute, reports Bureau of Labor Statistics data showing a lost-workday rate from same-level slips, trips and falls in hospitals of 38.2 per 10,000 employees, 90 percent above the average for all other private industries combined (20.1). The figures are from 2009 and cover all same-level falls, but NIOSH treats ice and snow as a hazard category of its own.
Where does the risk concentrate on a medical property?
NIOSH names four places for ice and snow in healthcare settings: entrances, parking garages and lots, walkways, and outside stairs. On most clinic sites you can be more specific. Think of the patient drop-off, the curb cut from the accessible stalls, the first few feet of walkway past the canopy, the staff door, the ambulance or transport bay, the oxygen and supply delivery door, and any ramp.
Canopies deserve their own look. SIMA's procurement standard, SIMA-10-2025, lists awnings and overhangs among structures that can create adverse conditions, along with clogged downspouts and water redirected into pedestrian areas. A canopy keeps snow off the drop-off but can drip at the edge and leave a shaded band of pavement that stays icy. Our guide to icicles and roof snow slides covers overhead hazards at entrances.
What should the clearing order be?
SIMA-10 puts site entrances and exits for emergency responders, sidewalks, building entrances and exits, accessible parking stalls and delivery ramps in its list of priority areas. For a medical site, write that into a specific order: emergency access first, then drop-off and main entrance, accessible stalls and the route from them to the door, staff entrances, and deliveries. General parking comes after that.
Windrows need particular care. A ridge of plowed snow across an access aisle or curb cut can stop a wheelchair just as well as a foot of new snow, so the plan should name those spots as places a windrow is never left.
What does the ADA expect in winter?
Generally, accessible features have to be maintained. The Department of Justice's ADA Title III manual says public accommodations must keep features required for access in working order, that an accessible route must remain accessible and not blocked, and that isolated or temporary interruptions for maintenance are not prohibited. Its ADA Guide for Small Towns, written for local governments under Title II, gives a direct snow example: maintenance would include removing snow from accessible parking spaces, access aisles, the accessible route to the accessible entrance and the entrances themselves, and alternate services should be provided if snow and ice cannot be cleared in a timely manner.
The Title III manual also says deactivating accessible automatic doors because of inclement weather would not be permitted, a detail worth passing to facilities staff. This is general information, not legal advice; ask an attorney how these rules apply to your facility. Our guide to keeping accessible routes clear covers this in more depth.
How is a 24-hour care facility different from a clinic?
A clinic has an opening time, so the plan can aim at it: walks and stalls clear before the first patient. A care home, assisted living community or anything else open around the clock has no quiet window, so the plan has to be built around other moments. SIMA-10 asks for critical timeframes including employee traffic and shift changes, deliveries and lighting schedules. List your actual shift changes, meal and supply deliveries, and visiting hours, and set expectations against those.
Overnight is a particular issue, because that is when melt refreezes and fewest people are around to notice. Ice monitoring, a contracted visit to check for ice forming, can be set up for those hours. Otherwise, name a staff role that checks the entrances at set times and knows who to call. SIMA-10 asks that responsibility for site monitoring and service calls be assigned to a party, so one of those options should be in writing.
Should staff have ice melt on hand?
NIOSH recommends it. Its healthcare workbook suggests labeled, secured bins of ice melting chemical with scoops that anyone can use immediately on icy patches, placed in areas of heavy pedestrian traffic such as the top and bottom of outdoor stairways, parking garage exits and entrances, and facility entrances. The bins should carry the product's safety data sheet and handling instructions. The workbook's checklist also asks whether chemicals are swept up once walkways are dry, which matters at a facility where residue tracks in on wheels and shoes.
The contract should say what your own staff can do and what the contractor is responsible for, so nobody assumes the other party has it covered. SIMA-10 asks that materials to be used, and any prohibited for site reasons, be identified. Our ice melt guide and our guide on pet-safe ice melt labels help when choosing products for walkways used by service animals.
What else does NIOSH recommend for healthcare sites?
Its prevention list goes beyond plowing. It calls for an aggressive program to promptly remove ice and snow from parking lots, garages and sidewalks, and for winter weather warnings sent to staff by email, or on bulletin boards for staff without email. It suggests freezing-weather warning monitors at the entrances to employee parking, and displaying the maintenance department's number so employees can report icy conditions. It also recommends extra mats at entrances in winter, and slip-resistant footwear, including ice cleats, for staff who work or travel outdoors.
Lighting is on its list as well: NIOSH treats inadequate lighting as a hazard in its own right, including in parking areas. Early and late winter shifts happen in the dark, when ice is hardest to see. If a pole light is out over the staff lot in December, that is part of your snow plan.
How do you prepare patients and visitors?
A few small steps help. Add a short winter note to appointment reminders that tells patients which entrance has the drop-off and suggests allowing extra time. Decide in advance what happens when a storm is bad enough to close or delay opening, and who tells patients. Those decisions belong to the practice, not the contractor, but the contractor needs to know them. There is little point in clearing to a 7 a.m. deadline if the clinic has already moved its first appointments to ten, and the opposite surprise is worse.
What records should a medical facility keep?
Every visit, with conditions at start and finish. SIMA-10 lists what a contractor's report should include, and a facility should add its own log of staff checks, service calls and incidents. That is especially important where the people on site are more likely to be hurt in a fall. Our guide to snow service records sets out the details, and our guide to slip-and-fall liability in Montana gives general background. Questions about your own exposure should go to your attorney or insurer.
What should you ask a contractor before signing?
Ask whether walkways and entrances are cleared before or after the lot, and who does them, because hand crews and plow trucks often run separately. Ask how the crew handles a drop-off lane with vehicles in it. Ask what happens on a night when there is no new snow but melt is forecast to refreeze. Ask how quickly someone responds to a call about ice at the door, and what the crew will do if it arrives while patients are walking through the work area. OSHA's guidance for snow work notes the value of high-visibility vests for anyone exposed to traffic, and the same awareness applies to a crew working around frail pedestrians.
Walk the route yourself with a contractor, ideally from the accessible stall to the front desk. If a stretch feels awkward on a dry day in October, it will be worse in January. Our guide to what to expect on response times can help you set realistic expectations.
This guide is part of our Montana Winter Property Guide. We scope commercial snow and ice management accounts per property, with entrances and accessible routes first, and our snow and 24-hour storm services cover events outside the normal cycle. Call HJ Property Care & Tree Service at (406) 215-7319 or request a snow proposal and we will walk the site with you before the first storm.
Need help?
HJ Property Care & Tree Service is locally owned and ISA-certified. Call for a free estimate.
This article is part of the Montana Winter Property Guide, our complete guide for western Montana property owners.
Explore our snow & 24-hour storm services.
Sources
We cite primary sources: Montana State University Extension, the City of Missoula, and the ISA, so you can verify anything here yourself.
- Facts About Older Adult Falls (Centers for Disease Control and Prevention). Last checked November 2, 2026.
- Slip, Trip, and Fall Prevention for Healthcare Workers (DHHS NIOSH Publication No. 2011-123) (National Institute for Occupational Safety and Health). Last checked November 2, 2026.
- SIMA-10-2025 Standard Practice for Procuring and Planning Snow and Ice Management Services (an American National Standard) (Snow & Ice Management Association (SIMA)). Last checked November 2, 2026.
- ADA Title III Technical Assistance Manual (III-3.7000 Maintenance of accessible features) (U.S. Department of Justice). Last checked November 2, 2026.
- ADA Guide for Small Towns (U.S. Department of Justice, Civil Rights Division). Last checked November 2, 2026.
- Winter Weather: Hazards (Occupational Safety and Health Administration). Last checked November 2, 2026.
Ready to transform your outdoor space?
Get a free, no-obligation estimate within 48 hours. Locally owned and ISA-certified.
